GALLERY

Current location> Industry application> Gallery

Case details

CASE DETAILS
In coal-fired power plants, the coal used for boiler combustion needs to be taken out of the bunker through the chain conveyor, and then sent to the mill through the coal feeder, where it is ground into pulverized coal and then blown to the boiler. In order to ensure the stability of the coal supply of the boiler at full load and especially at low load, three instruments need to be installed on the conveyor belt for redundant measurements.
FOLLOW US

Technical support:

Tips

Submitted successfully

Determine

Tips

Submitted successfully

Determine